4. Lift the inverter off the pallet using the forklift slots on the front or back. The left and
right fork slots are not designed for lifting the inverter and may only be used for ne
adjustments where the inverter’s full weight will not be lifted from a single side.
The front and back of the inverter base each have two fork slots that are 7.5”
wide and 26.5” apart on center. The left and right sides of the inverter base each
have two fork slots that are 7.5” wide and 21” apart on center.
4.2 Pre-Installation Inspection Steps
Before placing and installing the inverter, it should be inspected to identify possible
external and internal shipping damage. If a problem is identied during any of these
inspection steps please contact PV Powered’s Customer Service and Technical Support at
Step 1: External Inspection
Inspect the shipping materials and inverter for any cosmetic or structural damage.
Specically look for any structural damage or crushing of the base and doors. Conrm all
doors open freely and easily.
Step 2: Rear Magnetics Compartment
1. Remove the large cover plates on the back of the inverter, accessing the magnetics.
2. Inspect all nine connections including the following:
• Three connections into the inductor
• Three from the inductor to the transformer
• Three exiting the transformer
For each connection check the integrity of the busbar connections and terminals.
Figure 4-1 Busbar Connection and Terminal
3. Check the screens at the bottom of this compartment for damage or debris.