Electrical Connection SMA Solar Technology AG
26 SB25_30-IA-IEN115050 Installation Manual
12. Make sure the insulated conductors are securely
connected.
13. Screw the threaded sleeve onto the jack element.
14. Tighten the pressure screw or cable gland onto the threaded sleeve.
AC connection socket has been screwed together.
15. If the AC connection socket is not immediately connected to the inverter, close the AC plug on
the inverter with the protective cap provided.
Size used Procedure
PG13.5
The fastening case along with the sealing ring is pressed into the threaded
sleeve and can no longer be seen.
PG16 Tighten the swivel nut of the
cable gland.